Enterasys-networks SecureStack C2 C2RPS-POE Manuel d'utilisateur Page 24

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 34
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 23
Installing the C2RPS-POE on a Flat Surface
2-4 Installation
Guidelines for Installation
LocatetheC2RPSPOEwithin152cm(5ft)ofitspowersourceandonasurfaceasshown
inFigure 2 2.
Iftheswitchisbeinginstalledasastandaloneswitch,proceedtoConnecting
C2RPSPOECableandACPowerCordonpage 27forpowerconnectioninstructions.
Figure 2-2 Area Guidelines for C2RPS-POE
Installation on Flat Surface
Caution: To ensure proper ventilation and prevent overheating, leave a minimum
clearance space of 5.1 cm (2.0 in.) at the left, right, and rear of the switch.
Do not connect the switch to the AC power source until instructed to do so later in the
installation process
Precaución: Para asegurar una buena ventilación y evitar que el sistema se
sobrecaliente, deje un espacio mínimo de 5.1 cm (2 pulgadas) con respecto a los lados y
a la parte posterior del aparato..
No conecte la fuente del poder a la fuente primaria hasta que no se le indique.
1 Approximately 152 cm (5 ft) from power source 3 49.5 cm (19.5 in.) for proper ventilation
2 4.45 cm (1.75 in.) per C2RPS-POE (Vertical
clearance depends on number of devices
stacked.)
4 21.5 cm (8.5 in.) for proper ventilation
C2RPS-POE
POWER
Â
À
Ã
Á
C2RPS-POE
POWER
Â
À
Ã
Á
Vue de la page 23
1 2 ... 19 20 21 22 23 24 25 26 27 28 29 ... 33 34

Commentaires sur ces manuels

Pas de commentaire