Enterasys Networks CSX7000 Manuel d'utilisateur Page 83

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 729
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 82
H
ARDWARE
I
NSTALLATION
OVERVIEW
This chapter provides a description of the hardware installation process. It includes:
pre-installation requirements
selecting slots for adapters
setting switches
inserting adapters into backplane
connecting inter-board cables
Your distributor may have already completed this adapter installation. If not, follow this chapter’s
specific instructions.
PRE-INSTALLATION REQUIREMENTS
Before you begin the installation process, be sure to:
Choose a suitable setup location
Make sure the location is dry, ventilated, dust free, static free, and free from corrosive
chemicals
Verify system power requirements
If applicable, make sure the line voltage select switch is set for the AC input power source
you are going to use. The appropriate standard power cord is supplied with the system.
CAUTION:
When changing the line voltage select switch, make sure the AC power cord is unplugged.
Verify cabling requirements
The cabling included with your shipment will depend on the country in which your system
will operate. If additional cabling is needed other than what was shipped, contact your
distributor.
Only qualified personnel should install adapters into the
CyberSWITCH.
!
CAUTION
Any time you remove the system module cover, unplug the power
cord. Failure to do so may result in personal injury or equipment
damage.
The CyberSWITCH is sensitive to static discharges. Use a
grounding strap and observe all static precautions during this
procedure. Failure to do so could result in damage to the
CyberSWITCH.
Vue de la page 82
1 2 ... 78 79 80 81 82 83 84 85 86 87 88 ... 728 729

Commentaires sur ces manuels

Pas de commentaire