Enterasys Networks C2K122-24 Manuel d'utilisateur Page 37

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 70
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 36
Rack Mounting the Switch
SecureStack C2 Installation Guide 3-7
Thenextsteptoinstalltheswitchisdependentonthetypeofinstallation.Ifinstalling
severalswitchesinastack,proceedtoConnectingHighSpeedStackingCableson
page 39.Ifinstallingtheswitchasastandalonedevice,proceedtoConnectingACand
RPSPoweronpage 313
forpowerconnectioninstructions.
Figure 3-3 Area Guidelines for Switch Installation on Flat Surface
Rack Mounting the Switch
Toinstalltheswitchina19inchrack,youneed:
•Tworackmountbrackets andmountingscrews(rackmountkit)shippedwiththe
switch.
•Fourusersuppliedscrewstoattachtheswitchtoastandard19inchrack.
Caution: To ensure proper ventilation and prevent overheating, leave a minimum
clearance space of 5.1 cm (2.0 in) at the left, right, and rear of the switch.
Do not connect the switch to the AC power source until instructed to do so later in the
installation process.
Precaución: Para asegurar una buena ventilación y evitar que el sistema se
sobrecaliente, deje un espacio mínimo de 5.1 cm (2 pulgadas) con respecto a los lados y
a la parte posterior del aparato.
1 Approximately 152 cm (5 ft) from power source 3 44.5 cm (19.4 in.) for proper ventilation
2 4.45 cm (1.75 in.) per switch. (Vertical clearance
depends on number of switches stacked.)
4 419.0 cm (16.5 in.) for proper ventilation
À
Ã
Â
Á
Console
1
2
23
24
25 26
CPU
UP
RPS
MGR
DOWN
13
14
11
12
25 26242322212019181716151413121110987654321
C2K122-24
TX RX TX RX
Vue de la page 36
1 2 ... 32 33 34 35 36 37 38 39 40 41 42 ... 69 70

Commentaires sur ces manuels

Pas de commentaire